0760-23812560
Web: www.hanswell.net
0760-23812560
Web: www.hanswell.net
Modularization structure tunnel dryer maintenance and maintenance requirements:
A daily maintenance:
1. Keep the environment around the machine clean and do not stack debris on the machine.
2. When the machine starts, pay attention to observe whether the lamp is faulty and whether the fan has a blockage alarm.
Second, medium-term maintenance and maintenance: according to actual use (one month)
1. Clean the wool and dust on the filter net. Pull out the filter and blow it off with an air gun.
2. Clean the cloth wool on the fan blades. Remove the motor and blow it off with the air gun.
3. Clean the dust inside the electric box. Blow off the dust on the electronic surface.
Three-month maintenance and maintenance:
1. Lubricate the motor and clean the motor. (Belt rotation motor, circulation fan and exhaust fan).
2. Carefully check that the bearings on the drum are rotating well or have abnormal noise.